How long an agent's change takes from its issue to proven in production (), which step slows it, and how many merges needed fixing afterwards.
Loading work items…
How long an agent's change takes from its issue to proven in production (), which step slows it, and how many merges needed fixing afterwards.
Loading work items…
agent label to E2E passing after its deploy. Grouped by the day it was labelled, UTC.A merged agent PR escaped when, within 7 days of its merge, a bug fix, repair or security PR changed one of its files (lockfiles, docs/ and *.md don't count), a PR reverted it, or its issue was reopened. Decided once the 7 days have passed; the file overlap is a heuristic, so check the evidence. Grouped by the day of the merge, UTC.
No merged item in this range is decided yet.